Quiz Summary
0 of 20 Questions completed
Questions:
Information
You have already completed the quiz before. Hence you can not start it again.
Quiz is loading…
You must sign in or sign up to start the quiz.
You must first complete the following:
Results
Results
0 of 20 Questions answered correctly
Your time:
Time has elapsed
You have reached 0 of 0 point(s), (0)
Earned Point(s): 0 of 0, (0)
0 Essay(s) Pending (Possible Point(s): 0)
Categories
- Not categorized 0%
-
CLICK HERE to go back to the ECC Testing Center
Click View Questions button below to see the questions and custom feedback.
Please text 423-895-3247 if you need help or these tests are glitching.
Thanks!!
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- Current
- Review
- Answered
- Correct
- Incorrect
-
Question 1 of 20
1. Question
A single-phase transformer has a primary voltage of 240 volts and a primary current of 10 amperes. The transformer’s turns ratio is 4:1. What is the secondary voltage and secondary current of this transformer?
CorrectIncorrect -
Question 2 of 20
2. Question
A single-phase transformer with a primary voltage of 240V and a secondary voltage of 120V has a rated primary current of 20A. Calculate the rated secondary current of the transformer.
CorrectIncorrect -
Question 3 of 20
3. Question
What is the minimum size copper equipment grounding conductor required for a 200 amp feeder, supplying a detached garage located 50 feet from the main service panel?
CorrectIncorrect -
Question 4 of 20
4. Question
How many receptacles are required in patient bed (category 1) locations ?
CorrectIncorrect -
Question 5 of 20
5. Question
How many receptacles are required in an operating room?
CorrectIncorrect -
Question 6 of 20
6. Question
X-ray equipment that will run for 5 minutes or longer.
CorrectIncorrect -
Question 7 of 20
7. Question
Burial depth for network powered broad band conductors shall be at lease __________ inches when installed below 2 inch of concrete when installed in RMC.
CorrectIncorrect -
Question 8 of 20
8. Question
Network powered broad brand shall maintain a separating of at least _________ ft. from lighting conductors.
CorrectIncorrect -
Question 9 of 20
9. Question
What is the Duty Cycle demand factor for a resistance welder with a 40% duty cycle?
CorrectIncorrect -
Question 10 of 20
10. Question
Dry type transformers installed indoors and rated 112 1/2 KVA or less shall have a separation of how many inches from combustible material?
CorrectIncorrect -
Question 11 of 20
11. Question
What is the minimum burial depth for conductors in intermediate metal conduit that run under a building?
CorrectIncorrect -
Question 12 of 20
12. Question
What size copper equipment grounding conductor (EGC) would you select for a service with a 200 amp main breaker with 4/0 copper conductors?
CorrectIncorrect -
Question 13 of 20
13. Question
Overhead communication wires near service drops not exceeding 750 volts must have a clearance of ________ inches. of the service drop?
CorrectIncorrect -
Question 14 of 20
14. Question
What size copper wire would you select for a 62 amp load that is expected to run for 10 or more hours terminating to 75°C terminals?
CorrectIncorrect -
Question 15 of 20
15. Question
What does the N in THHN Stand for?
CorrectIncorrect -
Question 16 of 20
16. Question
For emergency stand by generators that require more than ________ seconds to develop power are permitted to have an auxiliary power supply.
CorrectIncorrect -
Question 17 of 20
17. Question
All receptacles within ____________ ft of a pool or spa must be GFCI protected.
CorrectIncorrect -
Question 18 of 20
18. Question
6 inch PVC must be supported at a minimum of every __________ Ft.
CorrectIncorrect -
Question 19 of 20
19. Question
What is the turn ratio of a transformer that has a 240v primary and a 120v secondary?
CorrectIncorrect -
Question 20 of 20
20. Question
What is the total resistance of this parallel circuit?
CorrectIncorrect